Dec 12, 2025 · Inspection
2 deficiencies cited
- Non-critical Measurement of Use Zone for Stationary Equipment
Inspector's note: The operation had added a geodome to the playground and the equipment did not have sufficient use zones around it. This was corrected during the inspection when the geodome was moved to different part of the playground where the use zones were sufficient. Risk level: Medium. Corrected during the inspection. - Critical Installation and Maintenance of Loose-fill Surfacing - Six Inches if Equipment 5 Ft or Less
Inspector's note: A small slide set had been added to an area of the playground that did not have loose-fill. Risk level: Medium High. Corrected by 2025-12-19.