Apr 29, 2026 · Inspection
3 deficiencies cited
- Critical Sheltering drill for Severe Weather- 4 times in a calendar year
Inspector's note: Operation has not completed any shetlering drills since 2023. Risk level: Medium High. Corrected by 2026-04-30. - Critical Fire Drill Monthly - Exit in 3 Minutes
Inspector's note: Operation has not completed any fire drills since 2024 Risk level: Medium High. Corrected by 2026-04-30. - Critical Lock-down drill 4 times in a calendar year
Inspector's note: Operation has not completed any lock drills since 2024. Risk level: Medium High. Corrected by 2026-04-30.