18 oct 2024
Aprobado
- Importante Otro hallazgo
Un problema que no encaja en las categorías comunes. Consulte la redacción oficial para ver los detalles.
Redacción oficial (en inglés): Capacity-Quantity and Availability (Pf)
Nota del inspector (en inglés): At the time of the inspection Hot water was depleted due to the volume that was being used to do a large cleaning on Thursdays. All other days there is sufficient hot water during normal day to day operations (as stated by management). Address to ensure enough hot water is provided during all operational hours. Water at the completion of the inspection was warming back up (70F).