Inspection
Jan 29, 2026
3 recorded violations
Official wording
(A)-(P) Person-In-Charge-Duties (Pf)
Inspector’s notes
There was a sprinkler break in the main lobby of the building this establishment is located on the lower level.Water is leaking into the basement storage. The sprinkler system is Offline per building manager Rick Karp. Establishment must provide documentation that the repairs & cleaning have been completed and the system is back online
In plain English
An issue that does not fit the common categories. Check the official wording for details.
More about other findingOfficial wording
System Maintained in Good Repair (P)
Inspector’s notes
Sprinkler break in the main lobby of the building residual water leaking into the basement storage of the establishment. (storage is elevated off the floor) Repair sprinkler pipe forward all repair documentation to the Health Department Email--ISDHealth@Boston.gov Building to be re-inspected by Building Plumbing & Health for approval to re-open
In plain English
Floors, walls, ceilings, lighting, ventilation, or garbage areas needed repair or cleaning. These are usually less urgent than food-handling problems but still need to be fixed.
More about building upkeep issuesOfficial wording
Cleaning Floors Dustless Methods (C)
Inspector’s notes
Clean/sanitize the basement floor to remove stagnate & pooling water as a result of the sprinkler break in the main lobby of the building
In plain English
Dishes, equipment, or surfaces that touch food were not properly washed, rinsed, and sanitized, or sanitizer was not at the right strength. Clean surfaces help stop germs from spreading to food.
More about cleaning or sanitizing problemsOfficial record from Boston Inspectional Services Department, Jan 29, 2026 · Original Source