Inspection
Oct 11, 2024
2 recorded violations
Official wording
Surface Characteristics-Indoor Areas (C)
Inspector’s notes
Wall behind the three bay sink peeling. Repaint 10-11-24 PIC stated that the wall will be painted this weekend. They did not want to paint until repairs have been made to the pipe below.
In plain English
An issue that does not fit the common categories. Check the official wording for details.
More about other findingOfficial wording
Repairing-Premises Structures Attachments and Fixtures-Methods (C)
Inspector’s notes
PIC will need to have a plumber come in to repair leaking three bay sink.
In plain English
Floors, walls, ceilings, lighting, ventilation, or garbage areas needed repair or cleaning. These are usually less urgent than food-handling problems but still need to be fixed.
More about building upkeep issuesOfficial record from Boston Inspectional Services Department, Oct 11, 2024 · Original Source