Inspection
Jan 21, 2026
3 recorded violations
Official wording
System Maintained in Good Repair (P)
Inspector’s notes
No hot water in the bathrooms. Plumber is on site and working on the issue. PIC has informed the staff that after they use the bathroom they are to wash their hands and then wash a 2nd time in the kitchen hand sink until the issue has been resolved.
In plain English
Floors, walls, ceilings, lighting, ventilation, or garbage areas needed repair or cleaning. These are usually less urgent than food-handling problems but still need to be fixed.
More about building upkeep issuesOfficial wording
Handwashing Signage (C)
Inspector’s notes
Provide hand wash signage at the hand sink and in the bathrooms.
In plain English
Staff were not washing their hands when required, or a handwashing sink was blocked, missing soap or paper towels, or used for something else. Hands are one of the most common ways germs reach food.
More about handwashing problemsOfficial wording
No wording provided in the official record.
Inspector’s notes
Provide proper verbiage for the allergen awareness.
In plain English
A plain-English explanation is being prepared. The official wording is the authoritative record.
More about inspection findingOfficial record from Boston Inspectional Services Department, Jan 21, 2026 · Original Source